Community AnnouncementsLocal newsNews

Stage 2 load shedding schedule

Eskom declared load shedding from this 08:00 this morning until 22:00 this evening.

The areas that should be affected according to the schedule are the following:

07:30 – 10:30 Brackenhurst and Extentions 1 & 2, Mayberrypark and Extention 1, Brackendowns and Extensions 1, 2, 3 & 4

10:00 – 13:00 Raceview, Southcrest, Newmarket (Pick n Pay), New-Redruth, Alberante and Extensions

12:30 – 15:30 Randhart Ext 1& 2, General Alberts Park and Randhart

15:00 – 18:00 Brackendowns 5, Albertsdal, Thokoza South (Ext 1 & 2), Thokoza Gardens, Everest, Unit F, Vergenoeg, Edenpark & Extentions, Greenfields, PholaPark & Extentions, Thinasonke

17:30 – 20:30 Civic Centre and CBD area, Alberton North and Extentions, Parklands Area, Florentia and Extentions, Verwoerd Park and Extentions

20:00 – 23:00 Meyersdal: Meyersdal (Eco Estate & Nature Estate), Thokoza North (Mpilisweni, Phenduka Section, Basothong Sections and Hostels)

Consumers may be affected by load shedding as per schedule above depending on how much load must be shed. The request from Eskom range from 10 MW to 300 MW and depending on how much must be load shed, the affected Areas in a block may be equitably reduced.

Should residents experience power loss that is outside of the scheduled times, it is advised that they phone the Ekurhuleni Metropolitan Municipality helpline at 086 054 3000.

At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!

Support local journalism

Add Alberton Record as a Preferred Source on Google and follow us on Google News to see more of our trusted reporting in Google News and Top Stories.

Related Articles

 
Back to top button